For agencies & economic development

Designed to NEVI standards, with room to spare

The Duncan hub meets or exceeds the federal NEVI minimums for power and port count on the I-85 Alternative Fuel Corridor. Here is how it lines up.

RequirementNEVI minimumDuncan hub
Ports per site416
Power per port150 kWUp to 325 kW (Tesla) and 360 kW (Espen)
ConnectorsCCS1CCS1 + NACS on all 6 Espen dispensers; NACS on Tesla
Uptime97%Tesla posts serviced by Tesla under its uptime guarantee
Session dataRequired reportingTesla session data via OCPI 2.2.1 and the Tesla for Business portal

Public benefit

What the corridor gets

Coverage

Every EV on one site

NACS and CCS1 side by side, so drivers don't need to know which network their car belongs to.

Freight

Room for larger vehicles

Four pull-through stalls near BMW Manufacturing and Inland Port Greer, where trailer and fleet traffic is heavy.

Investment

Inside an Opportunity Zone

The site sits in a federally designated Qualified Opportunity Zone, with a retail outparcel that adds local jobs and tax base.

Replicability

A template for the next exit

The choices made at Duncan can be repeated at other high-traffic exits on I-85, I-26 and I-95.

  • SiteA high-traffic exit on a designated Alternative Fuel Corridor
  • PowerEarly utility coordination for a service sized to run every stall at once
  • HardwareTesla and open-network dispensers together, covering NACS and CCS1
  • LayoutPull-through stalls for trailers and larger vehicles
  • RetailAn outparcel that gives drivers somewhere to go while they charge

Evaluating corridor charging?

We're glad to share specs, walk the site, or talk through what we've learned.

Contact the project team