Tesla
V4 Supercharger
10 posts · up to 325 kW
- 6 standard stalls
- 4 pull-through stalls for trailers and larger vehicles
- NACS connector
- Serviced and maintained by Tesla
The Hub · 30 Freeman Farm Rd · Duncan, SC
Ten Tesla V4 Superchargers and six Espen dispensers share a single Duke Energy service. Four of the Tesla stalls are pull-through, and a 1.26-acre outparcel sits at the entrance.
Tesla
10 posts · up to 325 kW
Espen
6 dispensers · up to 360 kW
Site layout
The hub parcel holds the chargers, ADA spaces and the utility yard. The outparcel beside it is held for a retail or food tenant.
| Hub parcel | Lot 1-C-2 · 0.93 ac |
|---|---|
| Outparcel | Lot 1-C-3 · ±1.26 ac |
| Parking | 18 spaces: 12 standard, 4 pull-through, 2 ADA van-accessible |
| Access | Freeman Farm Rd, ≈400 ft west of SC-101 |
Utility service
A dedicated Duke Energy transformer feeds the site, sized so all 16 ports can charge at the same time with room to add capacity later.
| Utility | Duke Energy |
|---|---|
| Transformer | 2,500 kVA |
| Service | 480 V, 3-phase, 4-wire |
| Switchboard | 3,000 A |
| Engineer of record | Matrix Technologies · R70154 |
Location
The hub sits on the Greenville–Spartanburg stretch of I-85, which carries about 103,900 vehicles a day past Exit 60.